Apart of phase one: the fireplace mantle was built appropriately to the size of the room

Apart of phase one: the fireplace mantle was built appropriately to the size of the room

Apart of phase one: A built in cabinet which doubles a railing and a serving area

Apart of phase one: A built in cabinet which doubles a railing and a serving area

Apart of phase one: Railings and baseboard were updated.

Apart of phase one: Railings and baseboard were updated.

Apart of phase one: Carpet was remove and white oak floors were installed.

Apart of phase one: Carpet was remove and white oak floors were installed.

Apart of phase one: Tile floor removed, white oak installed, railings and baseboard were updated.

Apart of phase one: Tile floor removed, white oak installed, railings and baseboard were updated.

Apart of phase two: Large built in for big screen tv removed, smaller built in to replace it.

Apart of phase two: Large built in for big screen tv removed, smaller built in to replace it.

Apart of phase two: The flanking cabinets were painted to match the rebuild, the glass doors were saved off the old and reused, and the tile was replaced with stone work to the ceiling.

Apart of phase two: The flanking cabinets were painted to match the rebuild, the glass doors were saved off the old and reused, and the tile was replaced with stone work to the ceiling.